General Information

Transaction name: Power Generation Joint Stock Corporation 3 
English name: POWER GENERATION JOINT STOCK CORPORATION 3 
Abbreviation name: EVNGENCO3
Stock symbol: PGV 
Listed at: HOSE
BRC: No. 3502208399 registered for the 1st time on November 26, 2012; the 9th the Department of Planning and Investment of Ho Chi Minh City

Charter capital:
11.234.680.460.000 VND
Headquarters:
No. 60 – 66 Nguyen Co Thach, Sala Urban Area, An Loi Dong ward, Thu Duc city, Ho Chi Minh City, Viet Nam
Tel.: (84.28) 3636 7449
Fax: (84.28) 36367450 
Email: genco3@genco3.evn.vn 
Website: http://www.genco3.com

General Information

Transaction name: Power Generation Joint Stock Corporation 3 
English name: POWER GENERATION JOINT STOCK CORPORATION 3 
Abbreviation name: EVNGENCO3
Stock symbol: PGV 
Listed at: HOSE
BRC: No. 3502208399 registered for the 1st time on November 26, 2012; the 9th the Department of Planning and Investment of Ho Chi Minh City

Charter capital:
11.234.680.460.000 VND
Headquarters:
No. 60 – 66 Nguyen Co Thach, Sala Urban Area, An Loi Dong ward, Thu Duc city, Ho Chi Minh City, Viet Nam
Tel.: (84.28) 3636 7449
Fax: (84.28) 36367450
Email: genco3@genco3.evn.vn
Website: http://www.genco3.com

Establishment & Development process

Power Generation Joint Stock Corporation 3 (EVNGENCO3) was established under Decision No. 3025/QD-BCT dated June 1, 2012 of the Minister of Industry and Trade and officially operated from January 1, 2013.

1996 – 2004

On April 7, 1996, Prime Minister Vo Van Kiet issued an order to start construction of Phu My Power Plant – the largest and most modern thermal power plant in Viet Nam at that time, contributed to solve the electricity shortage in the South, promoted production and economic development.
2004: Completed commercial operation of all Phu My Thermal Power Plants.

2004 – 2010

2004: The cluster project of 03 large terraced hydropower plants on Srepok River was started construction to solve the electricity shortage in the Tay Nguyen region, which were: Buon Kuop; Buon Tua Srah; Srepok 3, with a total capacity of 586 MW.
From 2009 to 2010: The Buon Kuop, Buon Tua Srah, and Srepok 3 hydroelectric plants were put into commercial operation.

2011 – 2017

On June 1, 2012, Power Generation Corporation 3 (EVNGENCO3) was established under Decision No. 3025/QD-BCT of the Ministry of Industry and Trade, on the basis of reorganizing and rearranging Phu My Thermal Power Company Limited, dependent accounting power generation companies, power source project management boards and receiving state capital ownership rights at a number of power generation companies under the Viet Nam Electricity Corporation. 2013: Establishment of Vinh Tan Thermal Power Company and Thai Binh Thermal Power Project Management Board.
2013: Establishment of Vinh Tan Thermal Power Company and Thai Binh Thermal Power Project Management Board
2014: Contributed Capital to establish GE-PMTP Power Service Limited Liability Company.
2015: Establishment of Mong Duong Thermal Power Company; EVNGENCO3 Power Service Company.
2016: Phu My Thermal Power Company was re- established and took over operation of Phu My power plants.
2017: Established Thai Binh Thermal Power Company.

2018 – 2024

2018: The Corporation converted to operate under the JSC model; Implemented IPO and registered to trade PGV shares of Power Generation Joint Stock Corporation 3 on Unlisted Public Company Market (UPCOM) on March 21, 2018.
2019: Relocated the Corporation’s headquarters from Ba Ria – Vung Tau province to Ho Chi Minh City.
2021: Market capitalization reached 1 billion USD.
2022: On February 10, 2022, officially listed on the Ho Chi Minh Stock exchange.
2023: The milestone marked 10 years of establishment and development of EVNGENCO3, opening a hopeful path in the next stage.
2024: Firm in Mind – Strong in Will on the path to sustainable development, affirming our capabilities in operations management & maintenance of power plants with the signing of the Operations Management and Maintenance Service Contract for Phu My 3 Power Plant and renewing the Operation Management Contract for Vinh Tan 4 Thermal Power Plant with Viet Nam Electricity.

1996 – 2004

On April 7, 1996, Prime Minister Vo Van Kiet issued an order to start construction of Phu My Power Plant – the largest and most modern thermal power plant in Viet Nam at that time, contributed to solve the electricity shortage in the South, promoted production and economic development.
2004: Completed commercial operation of all Phu My Thermal Power Plants.

2004 – 2010

2004: The cluster project of 03 large terraced hydropower plants on Srepok River was started construction to solve the electricity shortage in the Tay Nguyen region, which were: Buon Kuop; Buon Tua Srah; Srepok 3, with a total capacity of 586 MW.
From 2009 to 2010: The Buon Kuop, Buon Tua Srah, and Srepok 3 hydroelectric plants were put into commercial operation.

2011 – 2017

On June 1, 2012, Power Generation Corporation 3 (EVNGENCO3) was established under Decision No. 3025/QD-BCT of the Ministry of Industry and Trade, on the basis of reorganizing and rearranging Phu My Thermal Power Company Limited, dependent accounting power generation companies, power source project management boards and receiving state capital ownership rights at a number of power generation companies under the Viet Nam Electricity Corporation. 2013: Establishment of Vinh Tan Thermal Power Company and Thai Binh Thermal Power Project Management Board.
2013: Establishment of Vinh Tan Thermal Power Company and Thai Binh Thermal Power Project Management Board
2014: Contributed Capital to establish GE-PMTP Power Service Limited Liability Company.
2015: Establishment of Mong Duong Thermal Power Company; EVNGENCO3 Power Service Company.
2016: Phu My Thermal Power Company was re- established and took over operation of Phu My power plants.
2017: Established Thai Binh Thermal Power Company.

2018 – 2024

2018: The Corporation converted to operate under the JSC model; Implemented IPO and registered to trade PGV shares of Power Generation Joint Stock Corporation 3 on Unlisted Public Company Market (UPCOM) on March 21, 2018.
2019: Relocated the Corporation’s headquarters from Ba Ria – Vung Tau province to Ho Chi Minh City.
2021: Market capitalization reached 1 billion USD.
2022: On February 10, 2022, officially listed on the Ho Chi Minh Stock exchange.
2023: The milestone marked 10 years of establishment and development of EVNGENCO3, opening a hopeful path in the next stage.
2024: Firm in Mind – Strong in Will on the path to sustainable development, affirming our capabilities in operations management & maintenance of power plants with the signing of the Operations Management and Maintenance Service Contract for Phu My 3 Power Plant and renewing the Operation Management Contract for Vinh Tan 4 Thermal Power Plant with Viet Nam Electricity.

Business areas

Business areas

Management model, management structure

EVNGENCO3 is a company organized in the form of a joint stock company, operating under the parent-subsidiary company model with legal entity status.
The Corporation operates in accordance with the Law on Enterprises, possesses its own seal, emblem, and charter, and has branches and representative offices as stipulated by law.
It is entitled to open bank accounts and directly carry out business activities, project management, construction investment, and capital investment in subsidiaries and affiliated companies.

Member Units

EVNGENCO3 currently has 08 dependent accounting units, 02 subsidiaries where EVNGENCO3 owns over 50% of charter capital, 06 affiliated companies, capital contributions hold less than 50% of charter capital. Total installed capacity is 6,565 MW, accounting for 8.4% of the installed capacity of the entire power system, including many types of power sources:

Gas turbine

2,929 MW accounts about 44.61%

Coal thermal power 

2,424MW acconts about 36.92%

Hydroelectric

1,170MW accounts about 17.82%

Solar power

42.65MWp accounts about 0.65%

Member Units

EVNGENCO3 currently has 08 dependent accounting units, 02 subsidiaries where EVNGENCO3 owns over 50% of charter capital, 06 affiliated companies, capital contributions hold less than 50% of charter capital. Total installed capacity is 6,565 MW, accounting for 8.4% of the installed capacity of the entire power system, including many types of power sources:

Gas turbine

2,929MW accounts about 44.61%

Coal thermal power 

2,424MW acconts about 36.92%

Hydroelectric

1,170MW accounts about 17.82%

Solar power

42.65MWp accounts about 0.65%

Phu My thermal power company

Address: Phu My 1 Industrial Park, Phu My ward, Phu My city, Ba Ria – Vung Tau province 
Total capacity: 2,540 MW
Phu My Thermal Power Company manages and operates 04 powers plants:

Vinh Tan thermal power company

Address: Vinh Tan commune, Tuy Phong district, Binh Thuan province 
Total capacity: 1,283 MW
Phu My Thermal Power Company manages and operates 02 powers plants:

Mong Duong thermal power company

Address: Mong Duong ward, Cam Pha city, Quang Ninh province 
Total capacity: 1,080 MW
Mong Duong Thermal Power Company manages and operates 01 powers plants:

Buon Kuop hydropower company

Address: No. 22 Mai Xuan Thuong street, Thanh Nhat ward, Buon Ma Thuot city, Dak Lak province 
Total capacity: 586 MW
Buon Kuop Hydropower Company manages and operates 03 powers hydropower plants:

EVNGENCO3 power service company (EPS)

Address: 1228 Doc Lap, Phu My ward, Phu My city, Ba Ria-Vung Tau province

Main business and production areas: 


EPS is a brand built and developed by Power Generation Joint Stock Corporation 3 based on 26 years of experience in the field of operation, repairing and maintenance of large capacity power plants.
Currently, EPS is one of the leading companies, which provides professional O&M services for gas, coal, and solar power plants. Every year EPS carries out an average of 15 major repair projects.


SERVICES PROVIDED BY EPS:


Providing high quality power plant repair service packages: Maintenance of gas turbines, steam turbines of thermal power plants; Maintenance and repair of boilers and heat recovery steam generator (HRSG); Generator overhaul.
Recovering replacement materials, processing and manufacturing.
Consulting, design, installation of electrical and industrial projects: power plants, power stations.
Training on operation, repair, and rental operation services for power plants.
Other services.

Management board of vinh tan thermal power project (AVT board) 

Address: Hung Vuong avenue, quarter 5, Phu Thuy ward, Phan Thiet city, Binh Thuan province
Main business areas: AVT Board performs final settlement of projects in Vinh Tan Power Center and conducts research and development of new power source projects in the Corporation.

Management board of thermal power project no. 1 (AND1 board)

Address: Quarter 8, Mong Duong ward, Cam Pha city, Quang Ninh province
Main business areas: AND1 Board has completed the project management and settlement of the Mong Duong 1 Thermal Power Plant project. Currently, AND1 Board is researching new power source projects in the Northern region under the direction of EVNGENCO3.

Management board of thai binh thermal power project (ATB board)

Address: My Loc commune, Thai Thuy district, Thai Binh province
Main business areas: The ATB Board is implementing the final settlement of the Thai Binh Thermal Power Plant project.

Ba Ria thermal power joint stock company (BTP)

Address: Huong Giang quarter, Long Huong ward, Ba Ria city, Ba Ria – Vung Tau province
Capacity: 389 MW
Fuel used: Natural gas
Charter capital: 604,86 billion VND 
Contributed capital of EVNGENCO3:  481.24 billion VND 
Ownership ratio of EVNGENCO3: 79.56%

Ninh Binh thermal power joint stock company (NBP)

Address: No. 1 Hoang Dieu street, Van Giang ward, Hoa Lu city, Ninh Binh province  
Capacity: 389 MW
Fuel used: Coal dust
Charter capital: 604.86 billion VND
Contributed capital of EVNGENCO3:  481.24 billion VND
Ownership ratio of EVNGENCO3: 79.56%

Vinh Son – Song Hinh hydropower joint stock company

Address: 21 Nguyễn Huệ, thành phố Quy Nhơn, tỉnh Bình Định
Capacity: 356 MW
Charter capital: 2.362,41 billion VND
Contributed capital of EVNGENCO3: 608.72 billion VND
Ownership ratio of EVNGENCO3: 30.55%

Thac Ba hydro power joint stock company

Address: Thac Ba town, Yen Binh district, Yen Bai province 
Capacity: 120 MW
Charter capital:: 635.00 billion VND
Contributed capital of EVNGENCO3: 190.50 billion VND
Ownership ratio of EVNGENCO3: 30.00%

Se San 3a power investment and development joint stock company

Address: 96 Pham Van Dong, Hoa Lu ward, Pleiku city, Gia Lai province 
Capacity: 108 MW
Charter capital: 280.00 billion VND
Contributed capital of EVNGENCO3: 84.00 billion VND
Ownership ratio of EVNGENCO3: 30.00%

GE PMTP power service limited liability company

Address: Phu My 1 Industrial Park, Phu My ward, Phu My city, Ba Ria – Vung Tau province
Main business areas: Providing gas turbine repair services to domestic and regional customers.
Charter capital: 501.70 billion VND 
Contributed capital of EVNGENCO3: 74.46 billion VND
Ownership ratio of EVNGENCO3: 15.00%

Petrovietnam power nhon trach 2 joint stock company

Address: Phuoc Khanh commune, Nhon Trach district, Dong Nai province 
Capacity: 750 MW
Charter capital: 2,878.76 billion VND
Contributed capital of EVNGENCO3: 83.09 billion VND
Ownership ratio of EVNGENCO3: 2.47%

Viet Lao power joint stock company

Address: Floor 9, B Tower, HH4 Buidling, Pham Hung street, Me Tri ward, Nam Tu Liem district, Hanoi City
Capacity: 651 MW
Charter capital: 4,377.53 billion VND 
Contributed capital of EVNGENCO3: 19.60 billion VND 
Ownership ratio of EVNGENCO3: 0.45%

Dependent accounting units

Phu My thermal power company

Address: Phu My 1 Industrial Park, Phu My ward, Phu My city, Ba Ria – Vung Tau province 
Total capacity: 2,540 MW
Phu My Thermal Power Company manages and operates 04 powers plants:

Vinh Tan thermal power company

Address: Vinh Tan commune, Tuy Phong district, Binh Thuan province 
Total capacity: 1,283 MW
Phu My Thermal Power Company manages and operates 02 powers plants:

Mong Duong thermal power company

Address: Mong Duong ward, Cam Pha city, Quang Ninh province 
Total capacity: 1,080 MW
Mong Duong Thermal Power Company manages and operates 01 powers plants:

Buon Kuop hydropower company

Address: No. 22 Mai Xuan Thuong street, Thanh Nhat ward, Buon Ma Thuot city, Dak Lak province 
Total capacity: 586 MW
Buon Kuop Hydropower Company manages and operates 03 powers hydropower plants:

EVNGENCO3 power service company (EPS)

Address: 1228 Doc Lap, Phu My ward, Phu My city, Ba Ria-Vung Tau province
Main business and production areas: 
EPS is a brand built and developed by Power Generation Joint Stock Corporation 3 based on 26 years of experience in the field of operation, repairing and maintenance of large capacity power plants.
Currently, EPS is one of the leading companies, which provides professional O&M services for gas, coal, and solar power plants. Every year EPS carries out an average of 15 major repair projects.
SERVICES PROVIDED BY EPS:
Providing high quality power plant repair service packages: Maintenance of gas turbines, steam turbines of thermal power plants; Maintenance and repair of boilers and heat recovery steam generator (HRSG); Generator overhaul.
Recovering replacement materials, processing and manufacturing.
Consulting, design, installation of electrical and industrial projects: power plants, power stations.
Training on operation, repair, and rental operation services for power plants.
Other services.

Management board of vinh tan thermal power project (AVT board) 

Address: Hung Vuong avenue, quarter 5, Phu Thuy ward, Phan Thiet city, Binh Thuan province
Main business areas: AVT Board performs final settlement of projects in Vinh Tan Power Center and conducts research and development of new power source projects in the Corporation.

Management board of thermal power project no. 1 (AND1 board)

Address: Quarter 8, Mong Duong ward, Cam Pha city, Quang Ninh province
Main business areas: AND1 Board has completed the project management and settlement of the Mong Duong 1 Thermal Power Plant project. Currently, AND1 Board is researching new power source projects in the Northern region under the direction of EVNGENCO3.

Management board of thai binh thermal power project (ATB board)

Address: My Loc commune, Thai Thuy district, Thai Binh province
Main business areas: The ATB Board is implementing the final settlement of the Thai Binh Thermal Power Plant project.

Subsidiaries

Ba Ria thermal power joint stock company (BTP)

Address: Huong Giang quarter, Long Huong ward, Ba Ria city, Ba Ria – Vung Tau province
Capacity: 389 MW
Fuel used: Natural gas
Charter capital: 604,86 billion VND 
Contributed capital of EVNGENCO3:  481.24 billion VND 
Ownership ratio of EVNGENCO3: 79.56%

Ninh Binh thermal power joint stock company (NBP)

Address: No. 1 Hoang Dieu street, Van Giang ward, Hoa Lu city, Ninh Binh province  
Capacity: 389 MW
Fuel used: Coal dust
Charter capital: 604.86 billion VND
Contributed capital of EVNGENCO3:  481.24 billion VND
Ownership ratio of EVNGENCO3: 79.56%

Affiliated companies, capital contribution

Vinh Son – Song Hinh hydropower joint stock company

Address: 21 Nguyen Hue, Quy Nhon city, Binh Dinh province
Capacity: 356 MW
Charter capital: 2.362,41 billion VND
Contributed capital of EVNGENCO3: 608.72 billion VND
Ownership ratio of EVNGENCO3: 30.55%

Thac Ba hydro power joint stock company

Address: Thac Ba town, Yen Binh district, Yen Bai province 
Capacity: 120 MW
Charter capital:: 635.00 billion VND
Contributed capital of EVNGENCO3: 190.50 billion VND
Ownership ratio of EVNGENCO3: 30.00%

Se San 3a power investment and development joint stock company

Address: 96 Pham Van Dong, Hoa Lu ward, Pleiku city, Gia Lai province 
Capacity: 108 MW
Charter capital: 280.00 billion VND
Contributed capital of EVNGENCO3: 84.00 billion VND
Ownership ratio of EVNGENCO3: 30.00%

GE PMTP power service limited liability company 

Address: Phu My 1 Industrial Park, Phu My ward, Phu My city, Ba Ria – Vung Tau province
Main business areas: Providing gas turbine repair services to domestic and regional customers.
Charter capital: 501.70 billion VND 
Contributed capital of EVNGENCO3: 74.46 billion VND
Ownership ratio of EVNGENCO3: 15.00%

Petrovietnam power nhon trach 2 joint stock company

Address: Phuoc Khanh commune, Nhon Trach district, Dong Nai province 
Capacity: 750 MW
Charter capital: 2,878.76 billion VND
Contributed capital of EVNGENCO3: 83.09 billion VND
Ownership ratio of EVNGENCO3: 2.47%

Viet Lao power joint stock company

Address: Floor 9, B Tower, HH4 Buidling, Pham Hung street, Me Tri ward, Nam Tu Liem district, Hanoi City
Capacity: 651 MW
Charter capital: 4,377.53 billion VND 
Contributed capital of EVNGENCO3: 19.60 billion VND 
Ownership ratio of EVNGENCO3: 0.45%

Board of Directors

Ông ĐINH QUỐC LÂM

Chủ tịch HĐQT

Mr. DINH QUOC LAM 

Member of the BOD

Year of birth: 1973 

Qualifications: Master of Business

Administration, Electrical – Electronics Engineer

Number of shares represented: 445,769,198 Shares

Number of shares held: 54,155 Shares 

Work history:

01/1996 – 01/2020: Positions held: Deputy Manager, Manager of Operation Workshop, Deputy Director, Director of Phu My Thermal Power Company; Member of the BOD, CEO of EVNGENCO3; Member of the BOD performing the duties and responsibilities of Chairman of the BOD of EVNGENCO3, CEO of EVNGENCO3.

01/2020 – present: Chairman of the BOD

Positions held at other units: None

Mr. LE VAN DANH

Member of the BOD,
President & CEO

Ông LÊ VĂN DANH

Thành viên HĐQT,
Tổng Giám đốc

Year of birth: 1974

Qualifications: Master of Business

Administration, Electrical – Electronics Engineer

Number of shares represented: 334,326,898 Shares

Number of shares held:12,600 Shares

Work history:

11/1996 – 01/2020: Positions held: Deputy Manager, Deputy Manager in charge of Operation Workshop 1, Head of Planning – Materials Department, Deputy Director of Phu My Thermal Power Company; Deputy CEO of EVNGENCO3.

01/2020 – present: Member of the BOD, CEO of EVNGENCO3.

Positions held at other units: None

 

Ms. NGUYEN THI HAI YEN

Member of the BOD

Bà NGUYỄN THỊ HẢI YẾN

Thành viên HĐQT

Year of birth: 1974

Qualifications: Master of Business Administration, Bachelor of Labor Economics

Number of shares represented: 167,163,449 Shares

Number of shares held: 11,484 Shares

Work history:

09/1994 – 06/2023: Positions held: Deputy Head, Head of Organization – Labor Department of Phu My Thermal Power Company; Member of the BOD of Ninh Binh Thermal Power Joint Stock Company; Head of Organization and Human Resources Department of EVNGENCO3.

06/2023 – present: Full-time member of the BOD of EVNGENCO3.

Positions held at other units: None

Ông NGUYỄN MINH KHOA

Thành viên HĐQT

Mr. NGUYEN MINH KHOA

Member of the BOD

Year of birth: 1974

Qualifications: Master of Business Administration, Bachelor of Laws, Bachelor of English

Number of shares represented: 167.163.449 Shares

Number of shares held: 0 Shares

Work history:

07/2001 – present: Positions held: Deputy Head of the Department of Inspection and Securities and Legislation, Deputy Head of the Department of Legislation, Head of the Department of Legislation of Viet Nam Electricity.

01/2020 – present: Head of Department of Legislation of Viet Nam Electricity cum Part- time member of the BOD of EVNGENCO3.

Positions held at other units:

• Head of Department of Legislation, Viet Nam Electricity.

Ông ĐỖ MỘNG HÙNG

Thành viên độc lập HĐQT

Mr. DO MONG HUNG

Independent member of the BOD

Year of birth: 1958

Qualifications: Thermal Power Engineer

Number of shares represented:
0 Shares
Number of shares held: 0 Shares

Work history:

10/1981 – 04/2016: Positions held: Deputy Head of Automatic Thermal Measurement Department, Head of Planning Department, Electrical Testing Center – Electricity Company 1; Deputy Head of the Department, Head of the Power Source Engineering/Production Engineering Department, Head of the Safety Department of Viet Nam Electricity; Concurrent positions: Member of the BOD of Quang Ninh Thermal Power Joint Stock Company; Member of the BOD, Chairman of the BOD of Hai Phong Thermal Power Joint Stock Company.

09/2018 – present: Independent member of the EVNGENCO3 BOD

Positions held at other units: None

Ông ĐINH QUỐC LÂM

Chủ tịch HĐQT

Mr. DINH QUOC LAM

Member of the BOD

Year of birth: 1973 

Qualifications: Master of Business

Administration, Electrical – Electronics Engineer

Number of shares represented: 445,769,198 Shares

Number of shares held: 54,155 Shares 

Work history:
01/1996 – 01/2020: Positions held: Deputy Manager, Manager of Operation Workshop, Deputy Director, Director of Phu My Thermal Power Company; Member of the BOD, CEO of EVNGENCO3; Member of the BOD performing the duties and responsibilities of Chairman of the BOD of EVNGENCO3, CEO of EVNGENCO3.

01/2020 – present: Chairman of the BOD

Positions held at other units: None

Ông LÊ VĂN DANH

Thành viên HĐQT,
Tổng Giám đốc

Mr. LE VAN DANH

Member of the BOD,
President & CEO

Year of birth: 1974

Qualifications: Master of Business

Administration, Electrical – Electronics Engineer

Number of shares represented: 334,326,898 Shares

Number of shares held:12,600 Shares

Work history:

11/1996 – 01/2020: Positions held: Deputy Manager, Deputy Manager in charge of Operation Workshop 1, Head of Planning – Materials Department, Deputy Director of Phu My Thermal Power Company; Deputy CEO of EVNGENCO3.

01/2020 – present: Member of the BOD, CEO of EVNGENCO3.

Positions held at other units: None

 

Bà NGUYỄN THỊ HẢI YẾN

Thành viên HĐQT

Ms. NGUYEN THI HAI YEN

Member of the BOD

Year of birth: 1974

Qualifications: Master of Business Administration, Bachelor of Labor Economics

Number of shares represented: 167,163,449 Shares

Number of shares held: 11,484 Shares

Work history:

09/1994 – 06/2023: Positions held: Deputy Head, Head of Organization – Labor Department of Phu My Thermal Power Company; Member of the BOD of Ninh Binh Thermal Power Joint Stock Company; Head of Organization and Human Resources Department of EVNGENCO3.

06/2023 – present: Full-time member of the BOD of EVNGENCO3.

Positions held at other units: None

Mr. NGUYEN MINH KHOA

Member of the BOD

Ông NGUYỄN MINH KHOA

Thành viên HĐQT

Year of birth: 1974

Qualifications: Master of Business Administration, Bachelor of Laws, Bachelor of English

Number of shares represented: 167,163,449 Shares

Number of shares held: 0 Shares

Work history:

07/2001 – present: Positions held: Deputy Head of the Department of Inspection and Securities and Legislation, Deputy Head of the Department of Legislation, Head of the Department of Legislation of Viet Nam Electricity.

01/2020 – present: Head of Department of Legislation of Viet Nam Electricity cum Part- time member of the BOD of EVNGENCO3.

Positions held at other units:

• Head of Department of Legislation, Viet Nam Electricity.

Ông ĐỖ MỘNG HÙNG

Thành viên độc lập HĐQT

Mr. DO MONG HUNG

Independent member of the BOD

Year of birth: 1958

Qualifications: Thermal Power Engineer

Number of shares represented:
0 Shares
Number of shares held: 0 Shares

Work history:

10/1981 – 04/2016: Positions held: Deputy Head of Automatic Thermal Measurement Department, Head of Planning Department, Electrical Testing Center – Electricity Company 1; Deputy Head of the Department, Head of the Power Source Engineering/Production Engineering Department, Head of the Safety Department of Viet Nam Electricity; Concurrent positions: Member of the BOD of Quang Ninh Thermal Power Joint Stock Company; Member of the BOD, Chairman of the BOD of Hai Phong Thermal Power Joint Stock Company.

09/2018 – present: Independent member of the EVNGENCO3 BOD

Positions held at other units: None

Board of Management and Chief Accountant

Mr. LE VAN DANH

Member of the BOD,
President & CEO

Year of birth: 1974

Qualifications: Master of Business Administration, Electrical – Electronics Engineer

 Number of shares represented: 334,326,898 Shares

 Number of shares held: 12,600 Shares

Work history:

11/1996 – 01/2020: Positions held: Deputy Manager, Deputy Manager in charge of Operation Workshop 1, Head of Planning – Materials Department, Deputy Director of Phu My Thermal Power Company; Deputy CEO of EVNGENCO3.

01/2020 – present: Member of the BOD, CEO of EVNGENCO3.

Positions held at other units: None

Ông LÊ VĂN DANH
Tổng Giám đốc

Mr. TRAN DINH AN 

Vice President of Technique – Production

Year of birth: 1978

Qualifications:Master of Mechatronics, Electrical System Engineer

Number of shares represented: 0 Share

 Number of shares held: 7,420 Shares

Work history:

10/2001 – 03/2023: Positions held: Deputy Head of Technical Department of Phu My Thermal Power Company; Deputy Head of Technique – Production Department, Head of Planning Department of EVNGENCO3; Member of the BOD of GE-PMTP Power Service Limited Liability Company.

03/2023 – present: Vice President of EVNGENCO3.

15/10/2024 – present: Concurrent Director of Phu My Thermal Power Company
Positions held at other units: Director of Phu My Thermal Power Company

Mr. NGUYEN THANH TRUNG DUONG

Vice President of Business – Electricity Market

Year of birth: 1970

Qualifications: Master of Electrical Networks and Systems, Electrical Engineering Engineer

Number of shares represented: 0 cổ phần

Number of shares held 16,170 cổ phần

Work history:

07/1993 – 01/2013: Positions held: Manager of Electrical – Automatic Workshop, Board of Preparation for Production of Hydropower Plants on the Vu Gia – Thu Bon River, Manager of Electrical – Automatic Workshop cum Deputy Head, Board of Management of A Vuong Hydropower Project; Director of the Center for Hydropower Maintenance and Technical Services cum Deputy Head of the Department, Deputy CEO of A Vuong Hydropower Joint Stock Company.

01/2013 – present: Vice President of EVNGENCO3, cum Chairman of the BOD of Ninh Binh Thermal Power JSC.

06/2022: Concurrent Chairman of the BOD of Ninh Binh Thermal Power Joint Stock Company.

Positions held at other units: Chairman of the BOD of Ninh Binh Thermal Power Joint Stock Company.

Ms. NGUYEN THI THANH HUONG 

Vice President of Economics – Finance

Year of birth: 1977

Qualifications: Master of Business Administration, Bachelor of Economics, Bachelor of Language – English

Number of shares represented: 0 Share

Number of shares held 10,080 Shares

Work history:

08/2001 – 09/2018: Positions held: Deputy Head of Department, Chief Accountant of Phu My Thermal Power Company; Chief Accountant of EVNGENCO3.

10/2018 – present: Vice President of EVNGENCO3.

Positions held at other units: None

Mr. VO MINH THANG 

Vice President of Investment – Construction Management

Year of birth: 1977

Qualifications: Master of Business Administration, Electrical – Electronics Engineer

Number of shares represented: 0 Share

Number of shares held 12,180 Shares

Work history:

04/2001 – 04/2021: Positions held: Deputy Manager, Manager of Operation Workshop 1 of Phu My Thermal Power Company; Deputy Head in charge, Head of Business and Electricity Market Department of EVNGENCO3; Deputy Director, Deputy Director in charge, Director of Vinh Tan Thermal Power Project Management Board from 07/2019 to present.

04/2021 – present: Vice President of Investment – Construction of EVNGENCO3.
Positions held at other units:

Director of Vinh Tan Thermal Power Project Management Board.

Ms . VU PHUONG THAO

Chief Accountant

Year of birth: 1983

 Qualifications: Bachelor of Accounting

Number of shares represented: 0 Share

Number of shares held 945 Shares

Work history:

12/2007 – 08/2020: Positions held: Deputy Head of Finance – Accounting of Phu My Thermal Power Company; Deputy Head of Finance – Accounting Department of EVNGENCO3.

08/2020- present: 
Chief Accountant of EVNGENCO3.

Positions held at other units: None

Mr. LE VAN DANH

Member of the BOD,
President & CEO

Ông LÊ VĂN DANH

Thành viên HĐQT

Year of birth: 1974

Qualifications: Master of Business Administration, Electrical – Electronics Engineer

Number of shares represented: 334,326,898 Shares

Number of shares held: 12,600 Shares

Work history:

11/1996 – 01/2020: Positions held: Deputy Manager, Deputy Manager in charge of Operation Workshop 1, Head of Planning – Materials Department, Deputy Director of Phu My Thermal Power Company; Deputy CEO of EVNGENCO3.

01/2020 – present: Member of the BOD, CEO of EVNGENCO3.

Positions held at other units: None

Mr. TRAN DINH AN 

Vice President of Technique – Production

Year of birth: 1978

Qualifications: Master of Mechatronics, Electrical System Engineer

Number of shares represented: 0 Share

Number of shares held: 7,420 Shares

Work history:

10/2001 – 03/2023: Positions held: Deputy Head of Technical Department of Phu My Thermal Power Company; Deputy Head of Technique – Production Department, Head of Planning Department of EVNGENCO3; Member of the BOD of GE-PMTP Power Service Limited Liability Company.

03/2023 – present: Vice President of EVNGENCO3.

15/10/2024 – present: Concurrent Director of Phu My Thermal Power Company
Positions held at other units: Director of Phu My Thermal Power Company

Mr. NGUYEN THANH TRUNG DUONG

Vice President of Business – Electricity Market

Year of birth: 1970

Qualifications: Master of Electrical Networks and Systems, Electrical Engineering Engineer

Number of shares represented: 0 Share

Number of shares held 16,170 Shares

Work history:

07/1993 – 01/2013: Positions held: Manager of Electrical – Automatic Workshop, Board of Preparation for Production of Hydropower Plants on the Vu Gia – Thu Bon River, Manager of Electrical – Automatic Workshop cum Deputy Head, Board of Management of A Vuong Hydropower Project; Director of the Center for Hydropower Maintenance and Technical Services cum Deputy Head of the Department, Deputy CEO of A Vuong Hydropower Joint Stock Company.

01/2013 – present: Vice President of EVNGENCO3, cum Chairman of the BOD of Ninh Binh Thermal Power JSC.

06/2022: Concurrent Chairman of the BOD of Ninh Binh Thermal Power Joint Stock Company.

Positions held at other units: Chairman of the BOD of Ninh Binh Thermal Power Joint Stock Company.

Ms. NGUYEN THI THANH HUONG 

Vice President of Economics – Finance

Year of birth: 1977

Qualifications: Master of Business Administration, Bachelor of Economics, Bachelor of Language – English

Number of shares represented: 0 Share

Number of shares held 10,080 Shares

Work history:

08/2001 – 09/2018: Positions held: Deputy Head of Department, Chief Accountant of Phu My Thermal Power Company; Chief Accountant of EVNGENCO3.

10/2018 – present: Vice President of EVNGENCO3.

Positions held at other units: None

Mr. VO MINH THANG 

Vice President of Investment – Construction Management

Year of birth: 1977

Qualifications: Master of Business Administration, Electrical – Electronics Engineer

Number of shares represented: 0 Share

Number of shares held 12,180 Shares

Work history:

04/2001 – 04/2021: Positions held: Deputy Manager, Manager of Operation Workshop 1 of Phu My Thermal Power Company; Deputy Head in charge, Head of Business and Electricity Market Department of EVNGENCO3; Deputy Director, Deputy Director in charge, Director of Vinh Tan Thermal Power Project Management Board from 07/2019 to present.

04/2021 – present: Vice President of Investment – Construction of EVNGENCO3.
Positions held at other units:

Director of Vinh Tan Thermal Power Project Management Board.

Ms . VU PHUONG THAO

Chief Accountant

Year of birth: 1983

Qualifications: Bachelor of Accounting

Number of shares represented: 0 Share

Number of shares held 945 Shares

Work history:

12/2007 – 08/2020: Positions held: Deputy Head of Finance – Accounting of Phu My Thermal Power Company; Deputy Head of Finance – Accounting Department of EVNGENCO3.

08/2020- present: 
Chief Accountant of EVNGENCO3.

Positions held at other units: None

Board of Control

Mr. PHAM HUNG MINH 

Head of Supervisory Board 

Year of birth: 1970

Qualifications: Bachelor of International Economics, Bachelor of Accounting

Number of shares represented: 0 Shares

Number of shares held: 0 Shares

Work history:

10/2000 – 10/2018: Positions held: Deputy Head of Finance – Accounting, Ba Ria Thermal Power Joint Stock Company; Full-time Supervisor of EVNGENCO3.

10/2018 – present: Head of Supervisory Board of EVNGENCO3.

Positions held at other units: Specialist of Internal

Audit and Financial Supervision Department, Viet Nam Electricity.

Ms. VU HAI NGOC 

Member of Supervisory Board 

Year of birth: 1971

Qualifications: Master of Business Administration, Bachelor of Corporate Accounting

Number of shares represented: 0 Shares

Number of shares held: 0 Shares

Work history:

12/1992 – 06/2017: Positions held: Cashier, Salesman; Staff, Deputy Head of Finance – Accounting of Ba Dinh Power Company, Hanoi Power Corporation, Specialist of Internal Audit and Financial Supervision Department, Viet Nam Electricity.

07/2017 – present: SpecialistoftheInternalAudit and Financial Supervision Department of Viet Nam Electricity and Part-time member of the Supervisory Board of EVNGENCO3.

Positions held at other units: Specialist of the Internal Audit and Financial Supervision Department, Viet Nam Electricity.

Mr. DAU DUC CHIEN 

Member of Supervisory Board

Year of birth: 1977

Qualifications: Master of Electrical Engineering

Number of shares represented: 0 Shares

Number of shares held: 0 Shares

Work history:

05/2002 – 09/2018: Positions held: Operational manager of Transformer Station – Power Transmission Company No. 1; Specialist of Construction Management Department, Viet Nam Electricity.

09/2018 – present: Specialist of Construction Management Department cum Part-time member of Supervisory Board of EVNGENCO3.

Positions held at other units: Specialist of Construction Management Department, Viet Nam Electricity.

Mr. PHAM HUNG MINH 

Head of Supervisory Board 

Year of birth: 1970

Qualifications: Bachelor of International Economics, Bachelor of Accounting

Number of shares represented: 0 Shares

Number of shares held: 0 Shares

Work history:

10/2000 – 10/2018: Positions held: Deputy Head of Finance – Accounting, Ba Ria Thermal Power Joint Stock Company; Full-time Supervisor of EVNGENCO3.

10/2018 – present: Head of Supervisory Board of EVNGENCO3.

Positions held at other units: Specialist of Internal

Audit and Financial Supervision Department, Viet Nam Electricity.

Ms. VU HAI NGOC 

Member of Supervisory Board 

Year of birth: 1971

Qualifications: Master of Business Administration, Bachelor of Corporate Accounting

Number of shares represented: 0 Shares

Number of shares held: 0 Shares

Work history:

12/1992 – 06/2017: Positions held: Cashier, Salesman; Staff, Deputy Head of Finance – Accounting of Ba Dinh Power Company, Hanoi Power Corporation, Specialist of Internal Audit and Financial Supervision Department, Viet Nam Electricity.

07/2017 – present: SpecialistoftheInternalAudit and Financial Supervision Department of Viet Nam Electricity and Part-time member of the Supervisory Board of EVNGENCO3.

Positions held at other units: Specialist of the Internal Audit and Financial Supervision Department, Viet Nam Electricity.

Mr. DAU DUC CHIEN 

Member of Supervisory Board

Year of birth: 1977

Qualifications: Master of Electrical Engineering

Number of shares represented: 0 Shares

Number of shares held: 0 Shares

Work history:

05/2002 – 09/2018: Positions held: Operational manager of Transformer Station – Power Transmission Company No. 1; Specialist of Construction Management Department, Viet Nam Electricity.

09/2018 – present: Specialist of Construction Management Department cum Part-time member of Supervisory Board of EVNGENCO3.

Positions held at other units: Specialist of Construction Management Department, Viet Nam Electricity.

Development Orintation

General Goals

Main Tasks

Ensuring stable, reliable and economical operation of power plants.
Implementing cost optimization, ensuring production and business results assigned by the General Meeting of Shareholders.
Promoting investment in offshore wind power projects and flexible power plants in accordance with the implementation plan of Power Planning VIII; continue research and expedite procedures for investing in projects such as the LNG Power Plant at Long Son Power Center (Phase 1), Srepok 3 Extension Hydropower Plant, Buon Kuop Extension Hydropower Plant, and other clean/green power projects.

Continue seeking for long-term, sustainable partners to consume ash and slag from Vinh Tan 2 Thermal Power Plant in large quantities to ensure stable operation of Thermal Power Plants and the environment.
Continuing to: improve professional management, training and human resource development into a continuous learning organization; Optimal and professional labor arrangement, linking salary, income, career development opportunities with each individual’s work efficiency.
Promoting the completion of equitization settlement work; Prepare to implement the restructuring plan after being approved by competent authorities.
Ensuring national security and defense efforts; strengthen internal control and risk management.

Strategic Orientation

Orientation for maintaining and developing market share

Acknowledge the role and position in the power generation market, in order to serve long-term development goals and maintain appropriate market share in the coming period, EVNGENCO3 has been implementing the following main orientations: 
Power Generation: Maximize production of existing power generation sources and gradually implement fuel conversion according to Resolution No. 121/NQ-HDQT dated September 19, 2022, on development strategy for the period 2022 – 2030, vision to 2035.
Coal thermal power: With the motto of diversifying and proactively securing fuel supply; in addition to using domestic coal resources according to the signed agreement, EVNGENCO3 will continue to deploy solutions to purchase high-quality imported anthracite coal from global sources. This ensures sufficient fuel for production, enhances operational efficiency, and reduces heat consumption in power plant operations, implement research on converting operations mixed with Ammonia and Biomass to reduce emissions in line with global technological advancements.
Gas thermal power plants: Deploying operation using LNG gas to promote the efficiency of Phu My and Ba Ria power plants. Research to upgrade/ invest in new technology to operate in combination with Hydrogen gas in the future.
Investment in power projects: With strong orientations and financial situation, EVNGENCO3 aims to strive to grow and maintain an installed capacity ratio of more than 10% compared to the power system and contribute to the annual electricity output proportion of about 15% of the entire system’s electricity output.

Orientation on energy transition and construction investment


On September 19, 2022, The Board of Directors of EVNGENCO3 issued Resolution No. 121/NQ-HDQT on the development strategy for the 2022-2030 period, with a vision to 2035. A journey that requires strong determination and specific actions to overcome.
In the first phase of this journey, EVNGENCO3’s coal-fired power plants will be prioritized for investment with the goal of ensuring the environment with solutions to upgrade and improve environmental equipment and carbon capture. In addition, applying Ammonia mixed combustion and Biomass mixed combustion technologies will also contribute to ensuring the environment of coal power plants. For gas turbines, the clean energy transition will be carried out in a later stage, in which hydrogen mixing combustion is the top priority. Existing gas turbines will be upgraded and improved. Besides, EVNGENCO3 will also participate in many areas of the currently very vibrant and potential Hydrogen market.
Not only a direction, currently EVNGENCO3 along with many technology-ready partners who wish to accompany EVNGENCO3, also are realizing the goal of energy transition through investment research/Investment cooperation in new power source projects with a focus on green/clean power sources (offshore wind power, flexible ICE power plants, LNG power plants, small/medium power plants…).
With the aspiration to rise and fully accomplish its mission, EVNGENCO3 confidently moves forward on the journey of clean energy transition and sustainable development, aiming for a brighter future for future generations.

Orientation for restructuring EVNGENCO3

The restructuring process was marked from September 27, 2018 when EVNGENCO3 was the first power generation corporation in EVN to officially transform operations into a joint stock company. Company’s stock (PGV) traded on UpCom. Nearly 4 years later, on February 10, 2022, PGV shares were officially listed and traded on HOSE, with higher standards in listing activities and management of large-scale public joint stock companies, opened up opportunities to bring EVNGENCO3 closer to major domestic and foreign investors to continue promoting the restructuring process according to EVNGENCO3’s development strategy.
On December 31, 2024, the Commission for the Management of State Capital at Enterprises issued Decision No. 673/QD- UBQLV, approving the actual value of state capital at the official transition point to a joint stock company. This serves as a decisive foundation for EVNGENCO3 to implement its restructuring process in the coming period. EVNGENCO3 has been actively seeking potential investors, particularly professional investors and large corporations operating in related fields such as finance and technology, to participate in share acquisitions and become major shareholders of the Corporation. With the involvement of major investors, EVNGENCO3 aims to further enhance its resources (financial and human capital), adopt modern governance practices, and embark on a new phase of development in alignment with the growth of Viet Nam’s power sector.

Orientation on service providing development

REPAIR – O&M SERVICES: With a foundation of more than 25 years of repairing all types of thermal power plants from manufacturers MPW, GE, Siemens, Doosan, SEC, etc. EPS (EVNGENCO3’s branch) has continuously accumulated experience, mastered technology, developed the market and currently has carried out regular repairs and major repairs of power plants belonging to EVNGENCO3 and EVN with a total capacity of nearly 6,700 MW. Besides maintaining the market, EPS also continuously receives in-depth training on repair and maintenance of turbines, generators, boilers, wind turbines, manufacturing technology, boiler operation optimization technology, dynamic balance, … in advanced countries around the world with the aim of providing full package operation and maintenance services for domestic and foreign power plants. Currently, EVNGENCO3 is providing O&M services for Phu My 3 Power Plant and Phu My 2.2 Power Plant and has signed a 12-year O&M contract for Hiep Phuoc Power Plant.
PROJECTS MANAGEMENT SERVICES: Construction investment project management is also the strength of EVNGENCO3. With more than 25 years of experience participating in investment development and construction of large-scale power center projects including combined cycle gas turbines in Phu My, coal thermal power in Vinh Tan and Mong Duong, hydropower (in Buon Kuop, Ban Chat), etc. EVNGENCO3 will become a reliable partner providing management services for power projects inside and outside the industry in the near future.
PROVIDING ENERGY SERVICES: On July 3, 2024, the Government issued Decree 80/2024/ND-CP regulating the direct power purchase agreement (DPPA) mechanism. With its strengths and solid internal resources, EVNGENCO3 has prepared all necessary resources to establish an energy service unit (electricity market) to leverage its advantages and enhance operational efficiency.

Human resource development orientation

In parallel with the digital transformation strategy and the shift to clean energy, EVNGENCO3 proactively implements human resource development training programs to build a high-quality, professional workforce, t he “liberating spirit” is the key feature of these training courses, focusing on soft skills development with the goal of enhancing capabilities and competencies to meet the company’s development objectives. It fosters a spirit of collaboration and innovation, where all members strive together to make a difference and move forward. The decision- making process is diverse and collaborative, which is a distinctive feature of EVNGENCO3.
Management staff plays a pioneering role in digital transformation, improving management capacity, and adapting flexibly to lead and build a team of skilled employees with high technical expertise and professionalism, meeting the development requirements of the energy sector according to international standards. EVNGENCO3’s technical team is deeply trained in specialized knowledge, mastering technology and equipment systems, replacing foreign experts, and ensuring the safe operation management of the electricity system, with a focus on providing high- quality resources for operations and maintenance of various technological models.
Entering the next phase with the ambition to achieve the goals set by the company and continue to break through and reach further, with the passionate enthusiasm of the workforce in all areas, from operations management, technical work, project management, to advanced governance, and a spirit of continuous innovation and creativity, it is certain that the EVNGENCO3 team will continue to create sustainable and unique values in the next stage.

Sustainable development goals

ENVIRONMENT

Continue to invest and take deep actions in production and business operations to minimize negative impacts on the environment, respecting and complying with safety standards. Ensure that no incidents related to the environment occur and avoid administrative penalties in the field of environmental protection.

ECONOMIC

Maintain the goal of economic efficiency associated with sustainable development, increase benefits and practical values for stakeholders.

COMMUNITY, SOCIETY

Fulfill responsibility to society and the community through creating stable and sustainable jobs for workers; contribute to local economic development; fulfill tax obligations to the state; actively organize and participate in volunteer activities; sustainably accompany the community and society.

Risk management

In recent years, EVNGENCO3 has always strived to implement solutions to ensure the completion of targets assigned by the GMS. In particular, risk management plays an important role and is an indispensable part of corporate governance. Risk management is always focused by EVNGENCO3 to early identify potential risks and develop risk management solutions (prevent, minimize, avoid, control, and transfer risks), thereby minimizing losses; taking advantage of opportunities to promote sustainable development of the Corporation.
Every year, EVNGENCO3 builds a comprehensive risk program, issues a risk list and builds key risk profiles (including analysis of impact factors, likelihood/frequency of occurrence, solutions, additional methods as well as risk acceptance threshold…) for strict control. In addition, EVNGENCO3 has built a process- level risk profile to ensure that processes in EVNGENCO3 /Unit are implemented in accordance with regulations and minimize risks.

Risk profiles (including critical risk profiles and process level risk profiles) are built and controlled according to the following process:

RESULTS OF RISK MANAGEMENT IMPLEMENTATIO N IN 2024 OF EVNGENCO3:

The RMF (Risk Management Files) have been fully identified by the risk owners, including the causes and factors affecting the risks. The risk levels have been quantified, and 36 action plans have been developed to address the risks, along with the creation of 31 KRIs for risk monitoring.
A total of 403 risk files at the process level have been built, reviewed, and updated. The Corporation and risk owners have established management solutions to closely control the factors and risks affecting the activities of the Corporation and have proposed solutions and recommendations in related proposals/reports.

RISK MANAGEMENT PLAN FOR 2025 OF EVNGENCO3:

Based on analysis and assessment of key tasks in the fields of operation of the Corporation in 2025. Accordingly:
The Corporation focuses on managing risks that directly impact/affect the Corporation’s tasks in 2025 including:
▶ Electricity production guarantee
▶Solutions to optimize costs and enhance financial capacity 
▶ Investment in New Power Source Projects
▶ Implementing the restructuring plan
Regularly review and update key risk profiles and process-level risk profiles based on actual implementation status, in order to enhance the quality of risk management practices.